Skipped Profiling
Applying overlay to an unprofiled slab traps a weak boundary layer that causes delamination within months.
Grind First, Always
The installer grinds the slab to open the concrete pores before any overlay material is mixed or poured.
Restore, Don’t Replace
Spalled and pitted slabs restored to a flat, coatable surface, no full tearout required.
What Goes Wrong
Surface prep and overlay thickness are the two decisions that determine whether a bonded overlay lasts.
Applying overlay to an unprofiled slab traps a weak boundary layer that causes delamination within months.
The installer grinds the slab to open the concrete pores before any overlay material is mixed or poured.
Pouring overlay over deep spalls without patching them first creates voids that crack through the finished surface.
Delaminated areas and deep spalls are filled and cured before the overlay coat is applied across the slab.
Overlay applied too thin over a rough surface bridges unevenly, leaving high spots that wear through quickly.
Overlay thickness, typically 3/16 to 3/8 inch, is set in the written estimate based on the actual surface condition.
Sealing or coating before the overlay reaches full cure traps moisture and causes the topcoat to lift or blister.
The installer verifies full overlay cure before any sealer, stain, or epoxy topcoat is applied to the surface.
Scope of Work
One system handles surface restoration across residential, commercial, and industrial slabs in Fort Worth.
Spalled or scaling driveway concrete is profiled, patched, and overlaid to restore a flat, sealable surface.
Pitted pool deck concrete is overlaid with a polymer-modified mix rated for wet-area exposure and UV.
High-traffic slab surfaces are restored to a flat, bondable base ready for an epoxy or polyaspartic topcoat.
Opens concrete pores for a mechanical bond.
Fills voids before the overlay is poured.
3/16 to 3/8 inch polymer-modified coat.
Overlay finished for stain, seal, or epoxy.
Why Choose Us
Every job is scoped in writing, assessed on-site, and signed off at completion, no guesswork at any stage.
The estimate lists prep plan, overlay thickness, and materials, agreed in writing before the installer starts.
Every enquiry gets a no-obligation site visit so the installer can evaluate the actual slab condition.
Edge adhesion, surface flatness, and finish compatibility are checked and confirmed before the job closes.
We connect Fort Worth homeowners with independent local partners who carry the right tools and materials.
The Process
01
Submit your enquiry and we arrange an on-site visit where the installer evaluates the slab and surface condition.
02
You receive a written estimate covering prep method, overlay thickness, materials, and any planned topcoat system.
03
Once you approve the scope, the installer schedules the job and completes a final inspection at handover.
Tell us about your slab and we’ll arrange an on-site assessment with a written scope covering prep, materials, and coating layers.