About
About Fort Worth Epoxy Flooring
We arrange on-site assessments, written estimates, and inspected epoxy installations across the Metroplex.
The Process
From your first message to a cured, inspected floor
01
Tell Us About Your Floor
Describe the slab, garage, basement, warehouse bay, current condition, and any known issues like cracks or oil staining. The more detail, the better the installer can prepare.
02
Arrange an On-Site Assessment
We arrange a local installer to visit, inspect the concrete, check for moisture vapor transmission, and assess what surface prep the slab actually needs.
03
Review the Written Estimate
You receive a written scope covering concrete grinding, crack repair, primer, base coat, topcoat system, and timeline, before anything is booked or paid.
04
Installation & Cure
The installer grinds, preps, and applies the coating system. Cure time is built into the schedule, accounting for Fort Worth slab temperatures and the specific topcoat used.
05
Final Inspection & Sign-Off
Once the floor has reached full cure, the installer returns to inspect the finished surface and close the job with a formal sign-off.
Get a Written Estimate for Your Floor
Tell us about your slab and we’ll arrange an on-site assessment with a written scope covering prep, materials, and coating layers.